The Trent University Lecture Hall included some of the most intricate connection design requirements due to large shear and moment loads acting at the steel connection points. Alongside the theoretical challenge, Alma Group was in charge overseeing the installation process requirements due to the challenging geometric look of the building and site challenges with positioning elements.